CSV worksheet · Version 1.0
Vendor comparison scorecard
- Use during
- Vendor shortlisting and quote review, before a supplier is selected.
- What it’s for
- Compares technical fit, quality evidence, delivery, commercial terms, working relationship, and continuity risk against team-set criteria.
- How to use it
- Set weights first, enter evidence for each vendor, leave unknowns visible, and record the reason for the decision.
Document preview
25 rows · actual CSV| Category | Criterion | Weight (team-set) | Vendor | Score (1-5) | Evidence or link | Open question | Owner | Decision status |
|---|---|---|---|---|---|---|---|---|
| Technical fit | Required process and equipment | |||||||
| Technical fit | Material and finish capability | |||||||
| Technical fit | Geometry size and tolerance fit | |||||||
| Technical fit | Relevant comparable work | |||||||
| Quality | Relevant quality system or certification evidence | |||||||
| Quality | Inspection and measurement capability | |||||||
| Quality | Traceability and document control | |||||||
| Quality | Nonconformance and corrective-action process | |||||||
| Delivery | Current capacity and realistic lead time | |||||||
| Delivery | Minimum order and scale-up fit | |||||||
| Delivery | Equipment staffing and recovery resilience | |||||||
| Commercial | One-time engineering setup and tooling | |||||||
| Commercial | Unit price at common quantity breaks | |||||||
| Commercial | Inspection packaging freight duties and taxes | |||||||
| Commercial | Payment terms quote validity and warranty | |||||||
| Communication | Quality and speed of questions | |||||||
| Communication | Revision and change discipline | |||||||
| Communication | Named owner and escalation path | |||||||
| Continuity | Subcontracted operations and dependencies | |||||||
| Continuity | Material logistics and geographic risk | |||||||
| Pilot | Sample or first-article result | |||||||
| Decision | Hard-stop issue found? | |||||||
| Decision | Reason selected or rejected | |||||||
| Decision | Remaining risk and next checkpoint | |||||||