CSV checklist · Version 1.0

CAD revision and release checklist

Use during
Whenever a design package is issued or revised for quoting, prototyping, testing, or production.
What it’s for
Identifies the current design package, its revision, approval, intended use, and superseded history.
How to use it
Complete the checks, issue one dated package with a manifest, archive that issue, and record the recipient’s acknowledgment.

Document preview

26 rows · actual CSV
Scroll across to view every field
Preview of CAD revision and release checklist
SectionCheckRequired?StatusEvidence or file linkOwnerReview dateNotes
IdentityStable part assembly drawing or document identifier
IdentityRevision and status recorded
IdentityOwner and updated date recorded
IdentityWhere-used or linked deliverable recorded
ChangeSpecific change summary written
ChangeReason for change recorded
ChangePrior issue retained and marked superseded
PackageReferenced parts and assemblies agree
PackageDrawing and BOM revisions agree
PackageNative CAD included where appropriate
PackageNeutral and human-readable exports included
PackageUnits materials and finishes checked
PackageTolerances critical features and notes checked
PackageInspection and acceptance requirements included
PackageKnown deviations and open risks listed
PurposeIntended use named quote prototype test or production
ReviewReviewer or approver recorded
ReviewDecision date and conditions recorded
IssueOne dated package and manifest created
IssuePackage archived exactly as issued
IssueRecipients and purpose recorded
ReceiptVendor acknowledged package identifier and revision
Post-issueChange after quote or build reissued as a new package
Post-issueCost and schedule impact of change recorded
CloseoutFinal delivered evidence linked to the issued package